Railway Vehicle Production Control
Sample Rolling Stock Manufacturing Production Control Sheet
for details refer to the Train Manufacturing Page
This is a mock up of a sample production control sheet which would show the work required during part of a vehicle manufacturing program and the locations of the production stations where the work will eventually be done.
|
Production Control |
|||||||||||||||||||||
|
Vehicle Contruction Program |
|||||||||||||||||||||
|
Engineering Data List |
|||||||||||||||||||||
|
Document |
Production |
Document |
Corresponding |
Design |
Document |
Document |
Design |
Production |
Document |
Engineering |
Engineering |
Drafting |
COMMENTS |
ITEM |
|||||||
|
BOM LEVEL |
Number |
Station |
Description |
WBS Number |
Engineering |
BOM |
Percentage Of |
Completion |
Date |
Release |
Completion |
Estimated |
Estimated |
SEQ |
|||||||
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
Code |
Work Package |
Responsibility |
Status |
Completion Status |
Date |
Required |
Date |
Hours |
Hours Comp. |
Hours Comp. |
No. |
|||
|
6 |
E06-315-01 |
3 |
Trash Door |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
280 |
||||||||||
|
6 |
E06-315-02 |
3 |
Flapper Door |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
281 |
||||||||||
|
6 |
E06-316-01 |
3 |
Door Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
282 |
||||||||||
|
6 |
E06-314-01 |
0 |
Luggage Rack Weldment |
P Smith |
Completed |
100% |
03-19-99 |
04-30-99 |
0 |
0 |
283 |
||||||||||
|
6 |
C03-663-01 |
0 |
Luggage Rack Mounting Bracket |
P Smith |
Completed |
100% |
03-19-99 |
04-30-99 |
0 |
0 |
284 |
||||||||||
|
6 |
E06-309-01 |
3 |
Fiber Glass Panel Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
285 |
||||||||||
|
6 |
E06-312-01 |
3 |
End Wall Panel Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
286 |
||||||||||
|
5 |
E06-339-01 |
3 |
A End Trash and Luggage Locker Installation |
P Smith |
90% |
05-28-99 |
4 |
12 |
287 |
||||||||||||
|
6 |
E06-430-01 |
3 |
Panel Assembly A End Trash Locker |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
288 |
||||||||||
|
6 |
E06-314-02 |
0 |
Luggage Rack Weldment |
P Smith |
Completed |
100% |
03-19-99 |
04-30-99 |
0 |
0 |
289 |
||||||||||
|
6 |
C03-663-01 |
0 |
Luggage Rack Mounting Bracket |
P Smith |
Completed |
100% |
03-19-99 |
04-30-99 |
0 |
0 |
290 |
||||||||||
|
6 |
E06-344-01 |
3 |
Trash Door Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
291 |
||||||||||
|
6 |
E06-309-02 |
3 |
Fiber Glass Panel Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
292 |
||||||||||
|
6 |
E06-312-02 |
3 |
End Wall Panel Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
293 |
||||||||||
|
6 |
E06-340-01 |
3 |
Panel Assembly |
P Smith |
Completed |
100% |
05-28-99 |
04-30-99 |
0 |
0 |
294 |
||||||||||
|
4 |
E05-924-01 |
4 |
Electric Locker Wire Pack Installation |
10.4.3.2 |
N Leeson |
70% |
06-27-99 |
40 |
30 |
0 |
295 |
||||||||||
|
5 |
A10-397-112 |
4 |
Cable Clamp |
D Barker |
Completed |
100% |
06-27-99 |
05-17-99 |
0 |
0 |
296 |
||||||||||
|
5 |
A10-397-113 |
4 |
Connector Plug |
D Barker |
Completed |
100% |
06-27-99 |
05-17-99 |
0 |
0 |
297 |
||||||||||
|
5 |
A10-397-114 |
4 |
Connector Plug |
D Barker |
Completed |
100% |
06-27-99 |
05-17-99 |
0 |
0 |
298 |
||||||||||
|
5 |
A10-397-118 |
4 |
Pin |
D Barker |
Completed |
100% |
06-27-99 |
05-17-99 |
0 |
0 |
299 |
||||||||||
|
4 |
E05-925-01 |
2 |
Electric Locker Arrangement |
10.4.3.2 |
J Wesson |
Notebook |
60% |
04-28-99 |
60 |
25 |
35 |
300 |
|||||||||
|
5 |
E06-455-01 |
2 |
Main 480 Volt Circuit Breaker Panel Installation |
J Wesson |
Notebook |
10% |
04-28-99 |
3 |
7 |
301 |
|||||||||||
|
6 |
D04-444-01 |
2 |
Main 480 Volt Circuit Breaker Panel Assembly |
J Wesson |
Completed |
100% |
04-28-99 |
3-12-99 |
0 |
0 |
302 |
||||||||||
|
7 |
D04-445-01 |
2 |
Main 480 Volt Circuit Breaker Panel Weldment and Details |
J Wesson |
Completed |
100% |
04-28-99 |
05-06-99 |
0 |
0 |
303 |
||||||||||
|
6 |
D04-443-01 |
2 |
Cover Assembly 480 Volt Circuit Breaker Panel |
J Wesson |
Completed |
100% |
04-28-99 |
05-06-99 |
0 |
0 |
304 |
||||||||||
|
5 |
E06-401-01 |
2 |
Partition Walls Electric Locker Installation |
J Wesson |
04-28-99 |
305 |
|||||||||||||||
|
6 |
E06-426-01 |
2 |
Ceiling Panel Electric Locker Assembly |
J Wesson |
Completed |
100% |
04-28-99 |
05-21-99 |
0 |
0 |
306 |
||||||||||
|
7 |
E06-426-02 |
2 |
Face |
J Wesson |
Completed |
100% |
04-28-99 |
05-21-99 |
0 |
0 |
307 |
||||||||||
|
7 |
E06-426-03 |
2 |
Back |
J Wesson |
Completed |
100% |
04-28-99 |
05-21-99 |
0 |
0 |
308 |
||||||||||
|
7 |
E06-426-04 |
2 |
Core |
J Wesson |
Completed |
100% |
04-28-99 |
05-21-99 |
0 |
0 |
309 |
||||||||||
|
7 |
E06-426-05 |
2 |
Tapping Plate |
J Wesson |
Completed |
100% |
04-28-99 |
05-21-99 |
0 |
0 |
310 |
||||||||||
|
7 |
E06-426-06 |
2 |
Tapping Plate |
J Wesson |
Completed |
100% |
04-28-99 |
05-21-99 |
0 |
0 |
311 |
||||||||||
|
4 |
E05-926-01 |
1 |
Window Installation |
10.4.4.2 |
F Fluor |
Completed |
100% |
03-19-99 |
01-29-99 |
60 |
0 |
0 |
312 |
||||||||
|
5 |
A10-395-03 |
1 |
Emergency Window |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
313 |
||||||||||
|
5 |
A10-395-01 |
1 |
Small Passenger Window |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
314 |
||||||||||
|
5 |
A10-395-04 |
1 |
Side Door Window |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
315 |
||||||||||
|
5 |
A10-395-12 |
1 |
Side Door Gasket |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
316 |
||||||||||
|
5 |
A10-395-08 |
1 |
A/B End Door Window |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
317 |
||||||||||
|
5 |
A10-395-13 |
1 |
A/B End Door Gasket |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
318 |
||||||||||
|
5 |
A10-395-14 |
1 |
A/B End Door Locking Zip |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
319 |
||||||||||
|
5 |
A10-395-15 |
1 |
Side Door Gasket Locking Zip |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
320 |
||||||||||
|
5 |
A10-395-19 |
1 |
Small Passenger Window Locking Zip |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
321 |
||||||||||
|
5 |
A10-395-20 |
1 |
Emergency Window Locking Zip |
F Fluor |
Completed |
100% |
03-19-99 |
01-25-99 |
0 |
0 |
322 |
||||||||||
|
4 |
E05-929-02 |
5 |
Wall Panel Installation |
10.4.3.2 |
K Gingrich |
Notebook |
20% |
07-24-99 |
175 |
75 |
100 |
323 |
|||||||||
|
5 |
D04-078-01 |
5 |
Half Window Panel |
M Mobius |
Completed |
100% |
07-24-99 |
09-25-98 |
0 |
0 |
324 |
||||||||||
|
5 |
D04-090-01 |
5 |
Half Window ATR |
M Mobius |
Completed |
100% |
07-24-99 |
09-25-98 |
0 |
0 |
325 |
||||||||||
|
5 |
D04-088-01 |
5 |
Window Panel |
M Mobius |
Completed |
100% |
07-24-99 |
09-25-98 |
0 |
0 |
326 |
||||||||||
|
5 |
D04-077-01 |
5 |
Standard Window Panel |
M Mobius |
Completed |
100% |
07-24-99 |
09-25-98 |
0 |
0 |
327 |
||||||||||
|
5 |
D04-085-01 |
5 |
Upper Level Reverse Batten |
M Mobius |
Completed |
100% |
07-24-99 |
09-25-98 |
0 |
0 |
328 |
||||||||||